trenchless drilling Terms tagged with 'Excavation'
- Frac-Out
- Reclaimer
- Pipe Dope
- Agitator
- Desander
- Desilter
- Make Up
- Exit Side
- Rig Side
- Tail String
- Continuous Sliplining
- Fluid Density
- Guided Auger Boring
- Intersect Method
- Weeper Sub
- Sub Shim
- Carriage
- Tube Body
- Pin up
- Walk Over
- Pre-Ream
- Possum Belly
- Triplex Pump
- Microtunnel Shield
- Alkaline
- Auger
- Auger Machine
- Berm
- Boring Machine
- Bridge Plank
- Buoyancy Factor
- Bypass
- Caisson
- Cantilever
- Catch Basin
- Closed Face
- Cofferdam
- Conventional Trenching
- Conventional Tunneling
- Cradle Machine
- Cutter Wheel
- Cutterhead
- Cutting Bit
- Cuttings
- Dewatering
- Open Shield
- Overcut
- Pilot Bore
- Thrust Pit
- Trenching
- Wireline
- Centerline
- Drop Connection Manhole
- Easement
- Ejector Pump
- Emergency Recovery Shaft
- Encrustation
- Entrance Pit
- Guided Drilling
- Hand Excavation
- Headwall
- Horizontal Earth Boring Machine
- Intermediate Pipe Jacking Method
- Jacking Station
- Impact Ramming
- Mini-Horizontal Directional Drilling
- Open Face Shield
- Rod Pushing
- Shield Tunneling Method
- Slurry Shield Method
- Spacer Block
- Thrust Boring
- Drill String
- Guided Boring
- Jacking Pit
- Mixed Face
- Receiving Pit
- Shield
- Spoil
- Test Bore
- House Connection Manhole
- Cut-and-Cover Trenching
- Access Shaft
- Backwater
- Caisson Shaft
- Datum Plane
- Hammer Testing
- Heading
- Kettle
- Lagging
- Tail Void
- Tailings
- Tank Sewer
- Taper
- Water Table
- Excess Measured Depth
- Fuzzy Rule
- Steerable Auger Boring
- Small Boring Unit
- Digger Shield
- Pilot Hole
- Gigant
- Geotechnical Information
- Mud Flow
- Mud Wall
- Pull Pressure
- Hard Rock Drilling
- Transmission Line
- Duct Bank
- Directional Drill
- Line Locating
- Ground Improvement
- Trenchless Shoring
- Slurry
- Soldier Pile And Lagging
- Eductor
- Tunnel Face
- Offset Joint
- Soil Denisty
- Hydrovac Excavation
- Air Excavation
- Positive Displacement Blower
- Subterranean Lines
- Slot Trenching
- Underground Utilities
- Holding Tank
- Vacuum System
- Road Header
- Wellbore Excavation
- Contingent Resources
- Ground Freezing
- Bioremediation
- Ground Loss
- Bearing Strength
- Percussion Drilling
- Wash Boring
- Trial Pit
- Excavator Bucket
- Systematic Settlement
- Overcoring
- Timber Posts
- Radial Displacement
- Settlement Tank
- Benched Excavation
- Waste Disposal Regulations
- Reserve Pit
- Land Farming
- Thermal Desorption
- Coagulation
- Flocculation
- Preliminary Geological Data
- Test Pitting
- Flocs
- Full Bench
- Progressive Gel Strength
- Flat Gel Strength
- Supported Slab-On-Grade
- Soldier Piles and Lagging
- Bulk Density Test
- Large Diameter Tunneling
- Curved Drive
- Gyrocompass
- Canadian Common Ground Alliance (CCGA)
- Guided Boring Machine (GBM)
- Horizontal Auger Boring (HAB)
- Non-Mag (NMDC)
- Partially Hydrolyzed Polyacrylamide (PHPA)
- Pressurized Tunnel Bore Machines (PTBM)
- Regulatory Impact Analysis (RIA)
- Sequential Excavation Method (SEM)